Ball Mill Liner Upgrade at Chilean Copper Mine
2026-01-27 16:53:16
Challenge
Frequent replacement (every 4-5 months) of Hadfield steel liners in Φ5.5*8.5m ball mills caused excessive downtime at a major copper operation.
Solution
Installation of bimetal heat-treated alloy steel liners with optimized profile design.
Results
- Service life extended to 11.2 months (+124%)
- Annual maintenance cost reduced by 68%
- Power consumption decreased by 7.3%, saving 850,000 kWh/year
- Reduced annual downtime equivalent to $420,000 production value